LINK Fasteners & Fabricators
Link Fasteners & Fabricators Unit 2 fabrication shed and yard, Visakhapatnam

Structural Fabrication Unit

Unit 2

Cutting, rolling, welding and assembly of silos, hoppers, trusses, tanks and port equipment.

Focus
Structural steel fabrication
Location
Visakhapatnam, Andhra Pradesh
Quality
ISO 9001:2015
Standards
IS · BS · ASTM · DIN

About Unit 2

Structural Fabrication Unit

Unit 2 is LFF's structural fabrication unit. Large steel structures — silos, hoppers, storage tanks, columns, trusses, port equipment and solar mounting structures — are cut, rolled, welded and assembled here to your drawings.

Our in-house design team prepares the fabrication drawings, and structures are trial-assembled in the yard before dispatch, so they fit first time on site.

  • Built to your drawings
  • Trial-assembled before dispatch
  • Supplied with LFF fasteners
Wire-fed bolt forming machine with the wire straightener
Vibratory bowl feeder supplying blanks to the forming machine

Machinery & Capabilities

What Unit 2 is equipped with

6 core capabilities, all in-house — so quality is controlled at every stage.

Bolt former heading blanks, with finished blanks in the collection tray
  1. 01

    Plate & profile cutting

    Plasma and gas cutting of steel plates and sections to drawing.

  2. 02

    Plate rolling

    Rolling of steel plates into shells for silos and storage tanks.

  3. 03

    Welding bays

    Dedicated bays for structural welding of columns, trusses and hoppers.

  4. 04

    In-house design

    CAD/CAM design and drawing support before fabrication starts.

  5. 05

    Heavy lifting & assembly

    Cranes and open yard space for trial assembly of large structures.

  6. 06

    Dispatch & site support

    Loading of oversized sections and support for erection on site.

How We Work

From raw material to dispatch

Scroll to follow each step of the journey.

  1. Step 01

    Design & drawing

    Our team prepares the fabrication drawings.

  2. Step 02

    Cutting

    Plates and sections are cut to size.

  3. Step 03

    Rolling & forming

    Plates are rolled into shells and formed.

  4. Step 04

    Welding

    Parts are welded into the full structure.

  5. Step 05

    Inspection

    Dimensions and welds are checked.

  6. Step 06

    Dispatch & erection

    Loaded, delivered and erected on site.

What We Produce Here

Output from Unit 2

Select a product to see its details.

Inside the Unit

Photo gallery

FAQs

Questions about Unit 2

Unit 2 fabricates silos, hoppers, storage tanks, columns, trusses, port equipment and solar mounting structures.

Yes. We fabricate to customer drawings, and our in-house design team can also prepare the fabrication drawings for you.

Yes. Structures can be supplied with LFF high tensile fasteners and foundation bolts made in our Unit 1.

Yes. We handle loading of oversized sections and support erection of the structure on site.